For any shop that prices by size, quantity and labor.
Installation crews, contract manufacturing, sourcing or hourly services: define your own materials and operations and quote by the hour, the day or the line item.
What the customer writes, and what Teklif Atölyesi pulls out
Hi, we need a 2-person team to dismantle and reinstall the shelving in our warehouse, about 6 hours of work. Are you available this Saturday? Harry - Eastside Storage
Highlighted parts are what the parser read. The message is one of the sample requests in the industry pack.
Extracted fields
- Job
- Dismantle and reinstall shelving
- Crew
- 2 people
- Duration
- About 6 hours
- Date
- Saturday
- Customer
- Harry, Eastside Storage
- Location
- Customer's warehouse
Where does pricing leak in this trade?
Pricing depends on who you ask
Two people quote two different prices for the same job. Once the rules live in the system, pricing stops depending on the person.
Hourly and daily labor
Labor, machine hours and subcontracted services are separate line items, and an overhead share is added to every quote.
Old quotes are hard to find
See what you quoted a customer last time in seconds, and keep your prices consistent.
Things fall apart after approval
Once a quote is approved, the same record becomes the order and the work order; nothing is retyped.
Recipes included
A recipe: materials, operations, job details and formulas, default size and quantity breaks. Adapt them to your work and add your own.
The pack comes with 8 materials, 8 operations and 5 recipes.
- Services
Hourly service
Labour (hourly)
Job details (read from the message, priced in)- Duration
- People
Breaks: 1 / 2 / 4 / 8 - Services
On-site service / installation team
On-site service / installation (hourly, per person), Travel / call-out fee
Job details (read from the message, priced in)- Duration
- People
- Outsourcing & sourcing
Gift pack assembly (box + packing + shipping)
Shipping carton, Packing, Shipping / freight
Breaks: 50 / 100 / 250 / 500 - Manufacturing
Custom-made part (per piece)
Sheet material (m²), Consumables (screws, adhesive etc.), Machine time (hourly), Labour (hourly), Packing
Job details (read from the message, priced in)- Machine time (per part)
- Labour (per part)
300 × 200 mm, 10 pcsBreaks: 1 / 5 / 10 / 25 / 50 - Outsourcing & sourcing
Outsourced product / service (with markup)
Outsourced service (supplier, per piece), Packing, Shipping / freight
Breaks: 1 / 10 / 50 / 100
The modules that matter most here
Quote builder and cost engine
Nesting, job details, waste, labour and margin in one calculation.
AI request inbox
Size, quantity, material and due date pulled from the message.
Orders and deposits
Approved quotes turn into orders and deposit requests.
Reports
See which jobs, customers and materials actually make money.
General services & manufacturing: price your next job with Teklif Atölyesi.
Free for 14 days, no card needed. Or try the ready-made demo shop first.